
✕
Rixos Premium Dubrovnik
The original Construction (Hotel Libertas) was conducted between 1967 and 1972. Photo taken on June 18th, 2021 iPhone 8
Image dimensions: 4032 x 3024 pixels
The original Construction (Hotel Libertas) was conducted between 1967 and 1972. Photo taken on June 18th, 2021 iPhone 8
Image dimensions: 4032 x 3024 pixels